• http://roywebdesign.net/dimatteo/wp-content/uploads/2014/01/stillrd2.jpg
  • http://roywebdesign.net/dimatteo/wp-content/uploads/2014/01/stillrd5.jpg
  • http://roywebdesign.net/dimatteo/wp-content/uploads/2014/01/stillrd3.jpg
  • http://roywebdesign.net/dimatteo/wp-content/uploads/2014/01/stillrd4.jpg

45 unit residential sub division located on the Bloomfield/West Hartford line. The project consisted of DCI installing water sewer storm electrical and gas mains, as well as paving and mass earth cuts & fills.

© Copyright 2014. DiMatteo Construction Inc.

Created By: Roy Web Design